Gleeson – consultation homePublic consultation
Land south of Stoke Hammond and west of Leighton Road, MK17
Public exhibition: Tuesday 3 November 2026

Land south of Stoke Hammond

Early plans for new homes

Gleeson Land is preparing early proposals for up to 200 new homes on land south of Stoke Hammond and west of Leighton Road. Most of the site is in Soulbury Parish, next to Stoke Hammond village.

Buckinghamshire needs more homes, including more affordable homes. We are at an early stage and no planning application has been submitted. We want to hear from local people while the proposals can still be shaped, so that any future application reflects the needs of the area.

Early site plan. The site boundary, outlined in red, covers land south of Stoke Hammond between Leighton Road and the railway. Potential areas for development sit in the centre and north of the site, served by a main route from a main site access on Leighton Road. Open space with footpaths and leisure routes surrounds them, with a larger area of open space to the south. A public right of way crosses the north-west of the site. Pedestrian and cyclist access, also for emergencies, joins Leighton Road further south, and two potential bus stop locations are shown on Leighton Road.
  • Site boundary (14.20ha / 35.10ac)
  • Potential areas for development
  • Open space
  • Footpath through open space; and emergency access
  • Main route
  • Public right of way
  • Main access
  • Emergency access
  • Potential location of proposed bus stop
Early site plan, subject to change.View full-size plan
Approximate site location

Site location

The site is directly south of Stoke Hammond and extends along the western edge of Leighton Road. It comprises approximately 14 hectares.

Open in Google Maps

Come and meet the project team

  • Date
    Tuesday 3 November 2026
  • Venue
    Stoke Hammond Community Centre, Bragenham Side, Stoke Hammond, Milton Keynes MK17 9DB
  • Times
    3:30pm to 5:00pm, meeting room
    5:30pm to 8:00pm, main hall

No need to book. Come along at any point to see the plans, ask questions and give us your feedback in person.

Open in Google Maps

What we are proposing

  • 25% affordable homes, which is 50 homes if 200 are built
  • More than 50% of homes would be 2 or 3 bedroom homes, in accordance with the Neighbourhood Plan
  • At least 15% of homes designed to be accessible and adaptable
  • More than half of the site kept as open space, with new play areas, tree planting, landscaping and drainage features
  • No homes in the areas of the site at higher risk of river flooding, and a drainage system designed to manage surface water
  • Access from Leighton Road, a new footway towards the village, and new bus stops being investigated

Can't make it?

The exhibition boards and an online feedback form will be available on this website from 3:30pm on 3 November 2026. Please check back then.

Get in touch

If you have a question before the exhibition, or would like to be kept informed, please contact the project team.